loading

Supermax is a professional manufacturer of beer brewing equipment.

FAQs
all
Capacity & Equipment Selection
Compliance Certification & Export
Pre-construction planning
Cost & Budget
Automation & Operation
Installation, after-sales service & training
13
Do you handle export tariffs and customs clearance?

We offer FOB/CIF/DDP services, supporting door-to-door delivery. We provide packing lists, invoices, and certificates of origin, assisting with customs clearance documents and reducing client risks.

14
I want to build a small brewery. What size space do I need? What equipment is required for the minimum scale?

100L–500L ​​for bar/restaurant brewing; 30–80㎡ is sufficient to start.

500L–2000L is suitable for small commercial breweries. 30–200㎡ is sufficient to start.

Minimum standard equipment: mashing system, fermentation tank, beer tank, refrigeration system, control system, CIP cleaning system, heating system.

15
How long does it take from signing the contract to starting production for a small brewery?

Standard small brewery (500–2000L): Equipment production 60 days, sea freight + customs clearance 60 days, installation and commissioning 30 days, overall 5–6 months to start production.

16
What capacity specifications do your small-scale brewing equipment offer? What size should I choose?

We cover complete craft brewing equipment sets of 100L/200L/300L/500L/1000L/2000L/3000L/5000L.

· Bar/restaurant brewing: 100–500L;

· Small commercial breweries, offline retail: 500–1000L;

· Local distribution, small-batch wholesale: 1000–3000L.

17
Should I choose a two-, three-, or four-unit mashing system? What are the differences?

Two-stage mashing: High cost-effectiveness, suitable for small breweries with a capacity of 500L or less, simple operation.

Three-stage mashing: Higher efficiency, suitable for 500–1000L, continuous mashing is possible.

Four-stage mashing: High degree of automation, suitable for breweries with a capacity of 1000L or more, larger capacity and stronger stability.

 

18
How many fermentation tanks should be used? What is the fermentation cycle?

Standard ratio: 1 mashing system with 6–10 fermentation tanks; Standard beer fermentation cycle: 14–28 days, IPA and fruit beer cycles can be shortened to 10–15 days.

19
Is the equipment made of 304 or 316 stainless steel? What are the hygiene standards?

All parts in contact with the beer are made of 304/316 food-grade stainless steel, with mirror polishing inside and out, no dead corners, meeting FDA and CE food-grade hygiene requirements, suitable for the European and American markets.

20
How to control the quality of beer brewing equipment?

Every batch of our orders undergoes eight inspection stages, including raw material inspection, production process inspection, tank pressure testing, equipment packaging and loading, and finished product leakage testing. Each of our storage tanks has a data label with pressure test records and a serial number for future reference. Finally, the quality inspection department conducts detailed inspections and functional tests on the entire machine. Only after all items pass the tests can the equipment leave the factory, ensuring its stability and durability.

Jinan Supermax Machinery Co., Ltd is a professional manufacturer of beer brewing equipment.
Contact Us
Phone: +86 8571-8800
Address: Room B013, 309 East Area, F3, Building 9, Jinan Dia Shuangchuang Industrial Park, 2566 Century Avenue, Jinan High-tech Zone, Shandong, China. 
Contact us
wechat
email
whatsapp
Contact customer service
Contact us
wechat
email
whatsapp
cancel
Customer service
detect